World Wide Technology Gateway Technology Center Electrical Distribution

TW Constructors, as general contractor for World Wide Technology, oversaw the electrical distribution installation at the 1-million-square-foot warehouse facility.

The electrical distribution included furnish and installation of: L6-30 receptacle for server room, power to HVAC equipment that includes 5-chillers, 3-pumps,
and 6-air handling units, two (2) 600-amp panelboards for HVAC pumps and units, forty-five 30’ sections of 400-amp plus bus and powerheads, installing two 4000- amp feeder busducts from main substation outside to switchboards inside on the HVAC mezzanine, two 250-KW UPS units, one riser pole equipped with 34.5KV switch, underground 34.5KV, 500-amp capacity feeder in concrete encased conduit from riser pole to 34.5KV switchgear, concrete pad for 34.5KV switchgear, underground conduit from 34.5KV switchgear to each of the 7-current and future main substations, installation of 4-substations, 2-MW generator, one 750 and one 1,500KW generator, all data and fiber cable runs to support the 2-labs, warehouse, office, and break rooms, 30-amp, 480-volt, 3 phase power with safety disconnect for all 12-trash compactors, 7–dock levelers/lights/locks/batteries, upgrade to shell sprinkler monitoring system per codes, duct detectors and monitory p/code, car charging stations, 25-gas heaters, UPS and units.

Project Details

Location

Edwardsville, IL

Client

World Wide Technology

Project Type

Industrial / Warehouse

Contractor

TW Constructors

WWT GTC high res007
WWT GTC Electrical Distribution
WWT GTC high res008
WWT GTC high res009
WWT GTC high res002
WWT GTC high res004